Projects Handled

Innovating the Future of Power Infrastructure

Yash Enterprises has successfully executed numerous high-impact projects for the power industry, delivering precision-engineered solutions to enhance operational efficiency and equipment reliability. Below is a summary of our key contributions:

  • NTPC Vindhyachal
    - Supplied driving and trailing wheel yokes for stacker reclaimers, ensuring seamless operation and enhanced durability (repeat orders).
    - Engineered, fabricated, supplied, erected, and commissioned bucket wheel body parts for stacker cum reclaimers, strengthening system integrity.

  • NTPC Feroz Gandhi Unchahar (CHP)
    - Procured and supplied drive and trailing wheel bogie assemblies for Stacker Reclaimer 1, improving mobility and load-bearing capacity.

  • NTPC Sipat (CHP)
    - Delivered stacker reclaimer drive wheel bogie assemblies, maintaining operational efficiency (repeat orders).
    - Provided complete paddle wheel assemblies and buckets, enhancing material handling capabilities.
    - Supplied bucket wheel shaft assemblies, ensuring equipment reliability and longevity.
    - Conducted slew bearing inspections with a specialized team, reinforcing our expertise in critical maintenance.

  • SGTPS MPPGCL Birsinghpur (4x210 MW CHP-1)
    - Supplied and installed a slew bearing with hardware, including full erection and commissioning, boosting equipment reliability.
    - Delivered buckets with mounting pins for Krupp-make stacker cum reclaimers on conveyor 8A, optimizing operational performance.

  • PTPS Panipat (CHP-III)
    - Supplied complete bucket teeth sets for stacker cum reclaimers, ensuring efficient material handling and extended equipment life.
    - Provided slew bearings, enabling smooth rotation and operational continuity.

Additional Projects

  • Dry Sorbent Injection (SOx and NOx Reduction)
    - 1x210 MW
    - 3x250 MW
    - 2x210 MW

  • ESP Retrofit (SPM Reduction)
    - 2x500 MW

  • Pipeline Projects
    - ESP Retrofit for 11x210 MW Units: INR 500 Crores
    - BOP (Balance of Plant) for 2x660 MW Units: INR 1,400 Crores

These projects underscore Yash Enterprises’ technical expertise, reliability, and commitment to delivering tailored solutions for the power sector.